Coulsdon Landlord EICR

Landlord Electrical Safety Certificates in Coulsdon

A landlord electrical safety certificate in Coulsdon, London, is an Electrical Installation Condition Report (EICR), and NICEIC registered electricians carry out the five-yearly inspection and test of the fixed wiring. Coulsdon belongs to our landlord electrical safety certificates in Croydon coverage. All Service 4 U serves single-let and HMO landlords, letting agents, homeowners and buyers in CR5, and this page covers booking, licensing and housing.

Have your postcode, the number of bedrooms and consumer units, and your current report's next-inspection date ready.

  • NICEIC Approved Contractor since 2021
  • Price confirmed before we attend
  • Phone line open 24/7

Landlord electrical safety certificates

Booking an EICR in Coulsdon

Coulsdon can be booked at any time, day or night; evening, weekend and same-day appointments are available, subject to availability.

The inspection itself is outlined in what is checked during a landlord electrical safety certificate.

Covered

Coulsdon (CR5).

Have ready

bedrooms, consumer units (including any landlord's supply in a converted house), the date on your existing report for the next inspection, a tenant to arrange access with, and the licence number if one exists.

You receive

your EICR as an emailed PDF, listing each inspection, each test result and any C1, C2, C3 or FI observations.

Price

Landlord EICRs typically £150 to £335 plus VAT in London for a studio to a three-bedroom home, with the price for your property confirmed before we attend.

Deadline

please say if a licence application, a tenancy start or a council request is driving the date.

020 3740 6785

Property Licensing in Coulsdon and Your EICR

Croydon's additional licensing reaches Coulsdon because it covers all 28 wards, while its selective scheme covers 14 wards, and the Coulsdon Town and Old Coulsdon wards are not among them.

Councils ask for the EICR on licence application and on demand, licence conditions cover electrical safety, and the five-year duty applies to every private tenancy whether licensed or not. See property licensing in Croydon for the borough detail.

Additional licensing

borough-wide, 25 September 2026 to 1 September 2031, for smaller HMOs of three or four occupants from two or more households.

Selective licensing

14 of the borough's 28 wards, 25 September 2026 to 1 September 2031, for single-let and other non-HMO rentals; Croydon's previous borough-wide scheme ended on 30 September 2020.

Mandatory HMO licensing

borough-wide, for HMOs with five or more occupants from two or more households.

Rented Homes and Wiring in Coulsdon

Coulsdon's rented homes are mostly houses, with newer flats on large redevelopments. Census 2021 (ONS) shows 3,370 households around the centre: 15.6% private rented, 12.5% social rented and 67.4% owner occupied, with 24.2% of homes flats, 18.6% terraced and 57.1% semi-detached or detached. The VOA council tax stock at 31 March 2026 puts 30.6% of its 3,850 properties as built between 1919 and 1939 and 24.2% since 2000.

Cane Hill Park. The former Cane Hill psychiatric hospital site in Coulsdon Town ward has been redeveloped by Barratt and David Wilson Homes, with 659 to 677 new homes depending on the source, including housing-association homes. Communal circuits in apartment buildings are the freeholder's, while each let home's own installation is the landlord's to have inspected.

Interwar and older houses. A house of any age may have been rewired at some point, so the inspection records what is installed rather than assuming.

Electrical Certificate Services for Coulsdon Landlords

Four certificate services are available to Coulsdon landlords.

01

Landlord Electrical Safety Certificates (EICR) in Coulsdon

Selective licensing, back since 25 September 2026, puts single lets in view across 14 Croydon wards. Under the 2020 Regulations every rented home needs an EICR on the fixed installation at least every five years, supplied to existing tenants within 28 days, to new tenants before they move in, and to Croydon within 7 days of a request.

See landlord EICRs
02

HMO and Licensed Property EICRs in Coulsdon

Every HMO licence carries an EICR condition, and Croydon's additional and mandatory schemes both draw shared houses in. The council can ask for the report on application and on demand. If a house has been converted, a landlord's supply may sit next to each unit.

See HMO EICR certificates
03

Letting Agents and Portfolios in Coulsdon

Houses on one side and Cane Hill Park flats on the other can sit in a single schedule: next-inspection dates tracked, tenant access arranged, the PDF sent to agent and landlord. Both Croydon schemes end in 2031, a long diary entry.

See letting agent EICRs
04

PAT Testing for Landlord Appliances in Coulsdon

Appliances the landlord provides in furnished CR5 flats and licensed shared houses are PAT tested separately from the wiring, which the EICR alone covers. Book the two together or apart. See landlord PAT testing.

We also provide.

EICRs for homeowners and home buyers

Landlord electrical safety certificates

Book Your Coulsdon Landlord Electrical Certificate

Call 020 3740 6785 to book. Our phone line is open 24 hours a day, seven days a week, with same-day appointments available, NICEIC registered electricians and a fixed price confirmed before we attend. Our guide to the landlord electrical safety regulations sets out the duty.

020 3740 6785

Frequently Asked Questions

My rented property in Coulsdon is in a licensing area: what electrical paperwork does the licence add?

Coulsdon is covered by Croydon's additional licensing, in force from 25 September 2026 to 1 September 2031, while the Coulsdon Town and Old Coulsdon wards are outside the 14 selective wards. Any licence brings electrical conditions, with the EICR open to request at application or later.

Does every rented home in Coulsdon need an EICR, even without a licence?

Yes, for most private tenancies in England; the 2020 Regulations do not turn on whether a home is licensed. Social landlords (until the extension), lodgers, student halls, care homes and holders of long leases of seven years or more are the main exemptions.

What happens if the EICR for my Coulsdon rental is unsatisfactory?

One or more C1, C2 or FI observations produce an unsatisfactory report. The remedial work or investigation is due within 28 days, or earlier if the report says, and tenants and the council then need written confirmation within 28 days. We can quote separately for the remedial work.

How do I get the report, and who needs a copy in Coulsdon?

We send it as an emailed PDF. Croydon can ask for a copy and expects it within 7 days; current tenants get theirs inside 28 days and incoming tenants before occupying. Keep the report for the next inspection.

Do you cover nearby CR5 streets as well as Coulsdon?

Yes, CR5 is within our Coulsdon coverage, as is the whole of Greater London. Call 020 3740 6785 with your address to confirm and book.

Still have a question or need urgent assistance? Call 020 3740 6785, tell us what has happened and we will tell you what happens next.

Call 020 3740 6785 · 24/7